PROJECT OVERVIEW
Total land area: 10,000 m2
Number of townhouses: 75 townhouses
Area of ​​townhouse: 4m x 12m = 48m2, 4m x 15m = 50m2 ….
Construction: 1 Ground – 1 Level – 2 Floors and Terrace
Time of handover: From 31/1/2019 – 3/31/2019 (after 12 Months)
Handing over the house: perfecting the interior and finishing the exterior